Video

Zhongtong Cold Chain Warehouse – BICP Taiku PT Flat Slab

Zhejiang Zhongtong cold chain warehouse uses BICP Taiku post-tensioned flat slab system. Column grid 11.2m×12.6m, slab thickness 600mm, story height 13.27m. St.

Back to Home

The Zhejiang Zhongtong cold chain warehouse project, with total investment of RMB 980 million and total floor area of 219,000 m², utilizes BICP Taiku post-tensioned flat slab system for cold storage workshops. The column grid is 11.2m×12.6m, slab thickness 600mm, and story height 13.27m. This system provides a smooth slab soffit, reducing insulation work and overall cost compared to conventional beam-slab structures. It improves airflow distribution, enhances refrigeration efficiency, and increases storage capacity by over 15%, significantly boosting operational economic benefits. This case study addresses engineering pain points, solution evaluation, key parameters, and project value, suitable for reference during early communication among owners, construction units, design institutes, and general contractors.