BICPBuilding Intelligence Construction PlatformIndustrial Jointless Floor Engineering

BICP · Company Overview

Industrial Jointless Floor Engineering

BICP provides jointless industrial floor design and analysis for warehouses, plants, cold stores and automated facilities: fewer joints, controlled cracking and durable heavy-duty performance, with armoured joint systems manufactured and supplied by SHENTE where joints must remain.

Company Positioning

Engineering practice for large industrial floors

Design analysis for large industrial floors under heavy loads, forklift traffic, AGV operations and demanding service conditions.

How BICP and SHENTE work together

Engineering first, product supply only where joints must remain

Clients come to BICP with a floor problem. BICP analyses the floor and settles the design route. Where construction or functional joints must remain, BICP details them, and where an armoured joint is justified it is manufactured and supplied by SHENTE.

Years, projects, codes and patents on record

20+ years
focused on post-tensioned engineering and integrated industrial floors
1,000+ projects
in design and construction
8 codes
contributing author of national, industry, association and local codes (3 as first-listed contributor)
3 invention patents
plus 20+ utility-model patents and software copyrights

Beijing New Technology / New Product (Service) certification. Taiping: ultra-long joint-free floor layer solution for cleanroom plants (certificate XFW2023EE0050, issued December 2023). Holder: Beijing BICP Technology Co., Ltd.

The technical systems BICP draws on

Building types BICP works in

Key questions by building type

01

Cold-Chain Warehouses

How should low-temperature floors, column grids, storage capacity, racking and temperature zones be coordinated?

02

Industrial Plants

How should floors, structures and production conditions be coordinated to reduce maintenance and layout disruption?

03

Underground Car Parks

How should soil cover, clear height, excavation, drainage, uplift and total cost be assessed together?

04

Data Centres

How should high loads, dense services and future expansion be coordinated?

05

High-Standard Warehouses

How should land intensity, multi-storey operation, heavy floor loads and vehicle access be matched?

06

Logistics Warehouses

How should aisles, racking loads, joint durability and automated equipment travel be matched?

Supporting Capabilities

Post-Tensioned Structural Engineering

Compare column grids, spans, loads, clear height, services, construction and project economics to select the most efficient structural scheme.

TaiShu Cloud Project-Digitalisation Support

Support preliminary assessment, project coordination, document records and maintenance traceability.

Whole-Lifecycle Engineering Coordination

Connect preliminary assessment, scheme optimisation, material coordination, delivery and asset maintenance.

Shente Materials and Component Support

Anchorage, floor-joint and waterproofing materials for post-tensioned structures, integrated floors and underground works, supplied with batch traceability and quality records.

Submit your project for a preliminary review

Send the project type, location, floor area, loads and the issue you most want to resolve. The preliminary review is free; you will receive a written first assessment and the parameters needed for a detailed analysis.