Building Intelligence Construction Platform
Industrial Jointless Floor Engineering
Engineering
Engineering
Preliminary Project Review
Free first assessment of your floor project
Detailed Engineering Analysis
Independent paid design analysis
Floor System Optimisation
Structure · thickness · loads · crack control
Joint & Detail Engineering
Construction joints · doorways · loading bays
Service Scope
What BICP delivers and how we work
Applications
Applications
Logistics Warehouses
How should a logistics warehouse floor be designed for continuous forklift traffic and racking loads?
Industrial Plants
How should a production plant floor be designed for continuous operation and future layout changes?
Cold Storage Facilities
How should a cold-storage floor be designed for low temperatures, thermal cycling and forklift traffic?
Automated / AGV Warehouses
How should a floor be designed for AGV and AMR fleets?
High-Bay Warehouses
How should a high-bay or VNA warehouse floor be designed for rack loads and flatness?
Joint Systems
Joint Systems
Armoured Joint Systems →
Product Range
Standard · heavy-duty · low-impact
Technical Documents
TDS · CAD · installation · material
Manufactured & Supplied by SHENTE
Materials and quality records
Projects
Projects
All Projects →
Cold Storage Projects
Cold Storage Facilities
Industrial Facilities Projects
Industrial Facilities
Underground Parking Projects
Underground Parking Structures
Data Centers Projects
Data Centers
High-Standard Projects
High-Standard Warehouses
Logistics Projects
Logistics Warehouses
Technical Library
Technical Library
Jointless Floor Design
How large can an industrial floor be without saw-cut joints?
Crack Control
Why do large warehouse floors crack, and how is it controlled?
Forklift & AGV Floors
Why do forklifts bounce at joints, and how should floors be designed for AGVs?
Cold Storage Floors
How should cold-storage floors be designed for temperature cycling?
Floor Joint Engineering
How do armoured joints compare with saw-cut joints, and how are joints detailed?
Downloads & Guides
Selection guides and checklists
Videos
Project footage and technical talks
About BICP
About BICP
Company Overview →
Company History
Milestones · codes · certifications
Service Scope
Deliverables and how we work
Contact
Email and office details
中文
Submit Your Project
Menu
Engineering
▾
Preliminary Project Review
Detailed Engineering Analysis
Floor System Optimisation
Joint & Detail Engineering
Service Scope
Applications
▾
Logistics Warehouses
Industrial Plants
Cold Storage Facilities
Automated / AGV Warehouses
High-Bay Warehouses
Joint Systems
▾
Armoured Joint Systems
Product Range
Technical Documents
Manufactured & Supplied by SHENTE
Projects
▾
All Projects
Cold Storage Projects
Industrial Facilities Projects
Underground Parking Projects
Data Centers Projects
High-Standard Projects
Logistics Projects
Technical Library
▾
Jointless Floor Design
Crack Control
Forklift & AGV Floors
Cold Storage Floors
Floor Joint Engineering
Downloads & Guides
Videos
About BICP
▾
Company Overview
Company History
Service Scope
Contact
中文
Submit Your Project
Videos
Video center for solutions, projects and engineering insights
Home
/
Videos
Back to Home
All Videos
Company Introduction
Technical Insights
Project Footage
Client Interviews
Technical Insights
Technical explanation videos.
Videos are being prepared. You may review project cases and technical resources first.
⌕
Site Search
↗