Featured Projects
Project references for preliminary engineering assessment
Browse English project references by scenario to compare project conditions, key concerns, solution paths and reference value. Only reviewed English content is shown on the English site.
Luoyang Cigarette Factory Relocation Project
After commissioning, the workshop floor maintained good integrity over years of operation, with no significant cracking or joint deterioration. Dust accumulation was notably reduced compared to conventional jointed floors, meeting the high hygiene standards of cigarette manufacturing. Maintenance frequency was effectively lowered, reducing production downtime caused by floor repairs and positively impacting continuous production. This project is an early representative application of BICP's post-tensioned integrated floor technology in the tobacco industry and served as an important reference for subsequent promotion of BICP's Taiping post-tensioned integrated floor system in China's tobacco sector. It validated the engineering applicability of the post-tensioned integrated floor solution under high-cleanliness and high-forklift-traffic conditions, providing a reference for industrial facilities in tobacco, food, precision manufacturing, and other sectors with stringent floor hygiene and stability requirements.
View project →Industrial FacilitiesPost-Tensioned Integrated Floor System Successfully Poured at Qufu Economic Development Zone Science and Technology Innovation Industrial Park
This project demonstrates the construction efficiency and quality advantages of post-tensioned integrated floors in industrial facilities: 10,213.9 m² poured in 14 days, with the largest 2,870 m² bay having no saw cuts, significantly reducing future maintenance costs and improving floor flatness and durability.
View project →Industrial FacilitiesAirbus Full-Lifecycle Aircraft Service Project: Post-Tensioned Integrated Floor System Approved by European Airbus Expert Delegation
The post-tensioned integrated floor system covers approximately 25,000 m² with a single bay area of 7,000 m². It passed review by the European Airbus expert delegation, effectively improving floor overload capacity and recovery, reducing cracking, and lowering operational maintenance costs.
View project →Industrial FacilitiesTaiping System: 120m Ultra-Long Joint-Reduced Integrated Floor for Shifang Cigarette Factory Relocation Project
Achieved 120m joint-reduced monolithic floor bays, reducing maintenance and improving production continuity. Suitable for tobacco, logistics, lithium battery, and biomedical manufacturing facilities. Post-tensioned integrated floors applicable to industrial plants and underground garages; for cold storage, use UHPC integrated floor or UHPC repair system. Shente New Materials provides in-house prestressing anchors (Tai'an), armored joints (Tairen), anti-leak anchors (Taiqing), and UHPC materials (Taiheng) for quality assurance.
View project →Industrial FacilitiesTaiping® Post-Tensioned Integrated Floor System: Supporting the Operation of Airbus Aircraft Full-Lifecycle Service Center
Under applicable conditions, the Taiping® post-tensioned integrated floor system can reduce saw-cut joints for floor slabs up to 150–200 m in length. Compared to conventional construction, it reduces concrete consumption by 20–30%, rebar usage by 90–95%, carbon emissions by approximately 30%, and overall construction cost by 10–20%.
View project →Industrial FacilitiesTaiping® Post-Tensioned Joint-Reduced Floor System for Qufu Economic Development Zone Science and Technology Innovation Industrial Park
80% reduction in joints; 20–30% reduction in slab thickness; significantly lower maintenance costs; one-third shorter construction time; elimination of differential settlement.
View project →Industrial FacilitiesTaiping® Post-Tensioned Integrated Floor System: Low-Carbon Innovation for Sichuan Zhongyan Shifang Cigarette Factory Relocation Project
This case demonstrates how the Taiping® post-tensioned integrated floor system addresses common pain points in clean industrial facilities: reduced joints, enhanced cleanliness, higher load capacity, elimination of differential settlement, and lower maintenance frequency. The project achieved a maximum single-pour area of 6,300 m² with a length of 120 m, showcasing the system's capability for large-span, joint-reduced design.
View project →Industrial FacilitiesAirbus Chengdu Maintenance Hangar Project
Since operation, the hangar floor has performed stably under daily maintenance activities. The large-area seamless design effectively maintains hangar cleanliness, and the chemical resistance meets long-term durability requirements in the special hangar environment. This project is a representative application of BICP's Taiping UHPC integrated floor system in an aviation maintenance hangar, demonstrating the feasibility of UHPC solutions under combined demanding conditions of high point loads, impact, large-area seamless, and chemical resistance. It provides a reference for industrial scenarios with stringent floor requirements, such as aviation and precision manufacturing.
View project →Industrial FacilitiesBICP Wins Post-Tensioned Floor Project for Luoyang Cigarette Factory
This case demonstrates the application of BICP's post-tensioned floor technology in a large-scale industrial facility, highlighting key benefits such as reduced joint maintenance, enhanced durability, and improved operational efficiency. It serves as a reference for similar projects requiring high-performance floor systems.
View project →