ENGINEERING SOLUTION
Shente Materials and Component Support
Anchorage, floor-joint and waterproofing materials for post-tensioned structures, integrated flooring and underground works, supplied with batch traceability and quality records.
Manufacturing and supply role. SHENTE manufactures and supplies armoured joint systems and related materials specified through BICP's floor engineering. Engineering decisions on where a joint is required and how it is loaded come from the floor analysis. See Armoured Joint Systems →
How this solution supports early decisions
Anchorage, floor-joint and waterproofing materials for post-tensioned structures, integrated flooring and underground works, supplied with batch traceability and quality records.
What BICP needs first
Project type, location, approximate area, current stage, key loads and constraints. A complete document package is not required at the first contact.
What BICP provides initially
A direction-level assessment and a parameter checklist for further engineer review. Formal schemes depend on project documents and contract scope.
