BICP Taiping Post-Tensioned Floor System Promotional Video
BICP Taiping post-tensioned integrated floor system delivers ultra-long joint-free slabs for heavy-duty industrial floors. Seamless surface eliminates cutting, dust, and unevenness.
Videos
BICP Taiping post-tensioned integrated floor system delivers ultra-long joint-free slabs for heavy-duty industrial floors. Seamless surface eliminates cutting, dust, and unevenness.
BICP Taiku system: beamless flat slabs with AI-assisted design optimize column grids for wide-span column-free spaces, reducing material use and lifecycle costs.
BICP Taiku cold chain warehouse solution serves Chenzhou Agricultural Products Logistics Park, addressing low capacity and high costs with post-tensioned structures and integrated flooring.
Zhejiang Zhongtong cold chain warehouse adopts BICP Taiku post-tensioned flat slab system. Column grid 11.2m×12.6m, slab thickness 600mm, story height 13.27m. Storage capacity increased by over 15%.
Xianfeng Fruit East China Smart Cold Chain Project uses BICP's Taiku solution, increasing storage capacity by 16.7% with wider column grids and integrated flooring.
Qufu Economic Development Zone Science and Technology Innovation Industrial Park adopted BICP's post-tensioned floor technology.
BICP applied post-tensioned technology for Huangshanghuang cold chain warehouse, achieving large-span column grids and a joint-free structure, reducing civil costs by 15% and increasing effective storage capacity by 20%.
Chengdu Yinli Cold Chain Logistics Center uses BICP's Taiku large-span post-tensioned cold storage system, boosting rack capacity by 40% over the small-column-grid scheme.
Chengdu Airbus Aircraft Full Lifecycle Service Project uses post-tensioned integrated flooring. General contractor: China Construction Third Engineering Bureau. Designer: China Aviation Planning and Design Institute.