BICPBuilding Intelligence Construction PlatformIndustrial Jointless Floor Engineering

Videos

Video center for solutions, projects and engineering insights

Client InterviewsClient feedback, project operating experience and post-delivery review videos.
Client Interviews▶

Xianfeng Fruit East China Smart Cold Chain Project

Xianfeng Fruit East China Smart Cold Chain Project uses BICP's Taiku solution, increasing storage capacity by 16.7% with wider column grids and integrated flooring.

Watch video →
Client Interviews▶

Huangshanghuang Cold Chain Warehouse – BICP Case Study

BICP applied post-tensioned technology for Huangshanghuang cold chain warehouse, achieving large-span column grids and a joint-free structure, reducing civil costs by 15% and increasing effective storage capacity by 20%.

Watch video →
Client Interviews▶

Chengdu Airbus Full Lifecycle Project – Post-Tensioned Floor

Chengdu Airbus Aircraft Full Lifecycle Service Project uses post-tensioned integrated flooring. General contractor: China Construction Third Engineering Bureau. Designer: China Aviation Planning and Design Institute.

Watch video →