BICPBuilding Intelligence Construction PlatformIndustrial Jointless Floor Engineering

Videos

Video center for solutions, projects and engineering insights

Project FootageProject site footage and delivery process videos.
Project Footage▶

Chenzhou Agricultural Products Logistics Park – Taiku Cold Chain

BICP Taiku cold chain warehouse solution serves Chenzhou Agricultural Products Logistics Park, addressing low capacity and high costs with post-tensioned structures and integrated flooring.

Watch video →
Project Footage▶

Zhongtong Cold Chain Warehouse – BICP Taiku PT Flat Slab

Zhejiang Zhongtong cold chain warehouse adopts BICP Taiku post-tensioned flat slab system. Column grid 11.2m×12.6m, slab thickness 600mm, story height 13.27m. Storage capacity increased by over 15%.

Watch video →
Project Footage▶

Qufu ETDZ Sci-Tech Innovation Park – Post-Tensioned Floor Case Study

Qufu Economic Development Zone Science and Technology Innovation Industrial Park adopted BICP's post-tensioned floor technology.

Watch video →
Project Footage▶

Chengdu Yinli Cold Chain: Large-Span PT Solution Boosts Storage

Chengdu Yinli Cold Chain Logistics Center uses BICP's Taiku large-span post-tensioned cold storage system, boosting rack capacity by 40% over the small-column-grid scheme.

Watch video →