Resources

Guides, technical resources and company updates

Use selection guides, technical resources and company updates by resource type and business topic. project cases remain in the dedicated case center.

Current filter: Technical Resources · Industrial Floors
Technical Resource

Taiping Butler Service System: 10-Year Warranty, 24-Hour Response, 48-Hour On-Site Commitment

The Taiping butler service system is built on four core commitments: a 10-year warranty, 24-hour response, 48-hour on-site arrival, and regular inspections. This article details the operational mechanisms behind each commitment, including duty systems, regional service networks, digital work order systems, emergency travel plans, remote diagnosis protocols, and warranty coverage boundaries. It is designed for owners evaluating the Taiping solution to understand how the service system is delivered.

View resource →
Technical Resource

Post-Tensioned Slabs-on-Ground (SOG) for Industrial Facility Floor Structures

This article focuses on the Taiping solution for industrial facilities, outlining key technical points, project value, and application boundaries to assist project owners in preliminary decision-making.

Read article →
Technical Resource

Floor Joints: Industry Practice or Design Flaw?

Industrial floors are typically cut with joints every few meters as an industry practice. However, joints are not irreplaceable—they are a compromise solution to concrete shrinkage, leaving long-term issues such as spalling, hygiene contamination, and AGV interference. This article explains the origin and limitations of joints from the mechanism of concrete shrinkage, and then illustrates how post-tensioned integrated floor systems actively suppress cracking by applying pre-compression, extending joint spacing from ≤6 m to the order of 150 m.

Read article →