ENGINEERING SOLUTION
Adapting existing plants to new production needs starts with the floor
For existing floor defects and new demands from production-line changes and AGV/AMR. Survey and zoning come first, then a decision on repair or renovation.
Taigu | Existing Industrial Building Retrofit
Assessment, Zoned Repair and Life Extension for Existing Industrial Floorsfloor condition surveyzoned repairservice-life extension
How this solution supports early decisions
For existing floor defects and new demands from production-line changes and AGV/AMR. Survey and zoning come first, then a decision on repair or renovation.
What BICP needs first
Project type, location, approximate area, current stage, key loads and constraints. A complete document package is not required at the first contact.
What BICP provides initially
A direction-level assessment and a parameter checklist for further engineer review. Formal schemes depend on project documents and contract scope.
