Technical Library
Technical Library
Practical answers to industrial floor design questions, with design conditions, limitations and supporting references.
Crack Control
Why do large warehouse floors crack, and how is it controlled?
Shrinkage, restraint and temperature as the drivers of cracking, and how reinforcement, post-tensioning and construction sequence keep cracks tight.
Next step
Submit your project for a preliminary review
Send the project type, location, floor area, loads and the issue you most want to resolve. The preliminary review is free; you will receive a written first assessment and the parameters needed for a detailed analysis.
