BICPBuilding Intelligence Construction PlatformIndustrial Jointless Floor Engineering

About BICP

Service Scope

What BICP delivers

Engineering analysis and specialist design support for industrial floors and post-tensioned structures, from preliminary review to detailed engineering.

  • Preliminary project review: a written first assessment and the parameters needed for detailed analysis.
  • Floor system engineering: slab structure, thickness, loads, crack control and joint layout.
  • Structural engineering: column grid, span, load and clear-height optimisation for post-tensioned structures.
  • Existing floors: condition survey, defect zoning and repair recommendations.

How we work with your design team

BICP provides engineering analysis, technical consulting and concept / specialist design support, and works alongside your local design team and the licensed engineer of record, who integrates these inputs into the project design and takes it through local approval.

  • Deliverables include analysis reports, design concepts, specification inputs and technical recommendations.
  • Site supervision, testing and acceptance follow the procedures of the project and its jurisdiction.

SHENTE materials

SHENTE manufactures and supplies post-tensioning and related engineering materials, including armoured joint systems.

  • Each delivery comes with quality records and batch traceability.
  • Material selection advice is provided for the specific application and loads.

Project information and confidentiality

Drawings, data and site information you share are used only for your project.

  • Project data is used with authorisation, collected on a minimum-necessary basis and archived.
  • Project references that name an owner or use test data are published with the owner's consent.

The service content and deliverables for a specific project are set out item by item in the contract.

See the engineering services →