Technical Library
Technical Library
Practical answers to industrial floor design questions, with design conditions, limitations and supporting references.
Jointless Floor Design
How large can an industrial floor be without saw-cut joints?
Panel size, joint reduction and the design of large industrial slabs.
Next step
Submit your project for a preliminary review
Send the project type, location, floor area, loads and the issue you most want to resolve. The preliminary review is free; you will receive a written first assessment and the parameters needed for a detailed analysis.
