Technical Library

Technical Library

One page answers one engineering question: the direct answer first, then the engineering, the conditions, the limits and the evidence.

Back to Home

Floor Joint Engineering

How do armoured joints compare with saw-cut joints, and how are joints detailed?

Load transfer, edge protection, plate dowels, doorway and loading-bay details, and the joints that must remain in a jointless floor.

Articles for this topic are in preparation.

Next step

Submit your project for a preliminary review

Send the project type, location, floor area, loads and the issue you most want to resolve. The preliminary review is free; you will receive a written first assessment and the parameters needed for a detailed analysis.