BICPBuilding Intelligence Construction PlatformIndustrial Jointless Floor Engineering

BICP · Company History

Company History

01

Milestones

  1. 2006

    Anhui BICP Building Technology Co., Ltd. established

  2. 2010

    Beijing BICP Technology Co., Ltd. founded

  3. 2012

    Contracting qualifications obtained for post-tensioning works and special works (structural strengthening)

  4. 2013

    JGJ/T 302-2013, a standard BICP helped draft, was released

  5. 2014

    "Research on Key Post-Tensioning Technologies in Underground Space Structural Engineering" included in the MOHURD science and technology project plan

  6. 2015

    First recognised as a Zhongguancun High-Tech Enterprise

  7. 2016

    "Research on Key Post-Tensioning Technologies in Underground Space Structural Engineering" passes acceptance review with the conclusion 「达到了国内领先水平」

  8. 2016

    Chengdu Yinli Phase II B4/B5 cold store — China’s first large-grid post-tensioned cold storage

  9. 2016

    Research project on long-span post-tensioned cold storage structures undertaken

  10. 2017

    Luoyang Cigarette Factory — China’s first post-tensioned integrated floor with independent intellectual property rights

  11. 2017

    First recognised as a National High-Tech Enterprise

  12. 2018

    First Prize, CFLP Science and Technology Progress Award

  13. 2019

    JGJ/T 140-2019, a standard BICP helped draft, was released

  14. 2020

    Sichuan Provincial Science and Technology Progress Award and Li Bing Civil Engineering Award

  15. 2020

    Anhui Shente Prestressed Materials Co., Ltd. established, spun out of the company’s anchorage materials and equipment research unit

  16. 2021

    Project digitalisation team formed

  17. 2021

    First recognised as a Beijing "Specialised, Refined, Distinctive and Innovative" SME

  18. 2022

    Company renamed 北京银泰建构科技股份有限公司

  19. 2022

    Taiku recognised as a Beijing New Technology and New Product (Service)

  20. 2023

    Taiping recognised as a Beijing New Technology and New Product (Service)

  21. 2024

    iBLM cloud platform 1.0 released

  22. 2025

    Platform renamed iBLM TaiShu Cloud with the V2.4 release

  23. 2025

    Operations centre relocated to Hefei

  24. 2026

    Two cold storage association standards released

  25. 2026

    T/CECS 2151-2026 for concrete-structure cold storage takes effect

  26. 2026

    Hefei Zhushu Technology Co., Ltd. established, spun out of the company’s digitalisation team

02

Group entities

The group comprises separately registered legal entities. Their registered names exist only in Chinese and are reproduced here as registered.

  • 北京银泰建构科技股份有限公司

    Engineering

  • 安徽银泰建构建筑科技有限公司

    Engineering · est. 2006

  • 安徽省申特预应力材料有限公司

    Materials (SHENTE)

  • 合肥筑枢科技有限公司

    Digital (TaiShu Cloud)

Project inquiry

Share the project type, stage, location and the issue you most want to resolve.