Industrial Facilities

Luoyang Cigarette Factory Relocation Project

After commissioning, the workshop floor maintained good integrity over years of operation, with no significant cracking or joint deterioration. Dust accumulation was notably reduced compared to conventional jointed floors, meeting the high hygiene standards of cigarette manufacturing. Maintenance frequency was effectively lowered, reducing production downtime caused by floor repairs and positively impacting continuous production.

View project →
Industrial Facilities

Taiping® Post-Tensioned Joint-Reduced Floor System for Qufu Economic Development Zone Science and Technology Innovation Industrial Park

80% reduction in joints; 20–30% reduction in slab thickness; significantly lower maintenance costs; one-third shorter construction time; elimination of differential settlement.

View project →
Industrial Facilities

Taiping System: 120m Ultra-Long Joint-Reduced Integrated Floor for Shifang Cigarette Factory Relocation Project

Joint-reduced integrated floor bays up to 120 m long and about 6,300 m² per single pour, with building joints eliminated and only a few structural joints left, lowering long-term maintenance costs.

View project →
Industrial Facilities

Airbus Chengdu Maintenance Hangar Project

The floor design was approved by the Airbus expert delegation from Europe, and the project is in operation. Higher overload and recovery capacity, less cracking and lower maintenance costs make it a reference for large hangar and heavy-duty industrial floors.

View project →