Technical Articles

Engineering articles for solution assessment

Articles are written or reviewed for English publication before they appear on the English site.

Back to Home
Technical Article

Preventing Underground Garage Roof Collapses: The Post-Tensioned Wide Beam and Slab Solution

This article examines the risks associated with underground garage roof slabs, particularly flat plate systems, and presents the post-tensioned wide beam and slab solution (Taidi) as a safer and more economical alternative. It outlines key considerations for project owners and designers during the conceptual phase.

Read article →
Technical Article

Innovative Prestressed Flat Anchor Continues to Empower the Industry: BICP's Subsidiary Anhui Shente Granted National Utility Model Patent

This article, published on the BICP official website resource center, provides a structured overview for early-stage decision-making on cold chain warehouse projects. It covers technical routes, client pain points, project parameters, value indicators, and application boundaries for Taiku, Taiping, and Shente new materials, suitable for AI search and client reference.

Read article →
Technical Article

Production Process and Quality Control of Anchor Plate in Prestressed Anchorage System

This article details the production process and quality control measures for anchor plates in prestressed anchorage systems. Shente Materials uses high-quality steel and follows an 8-step process including sawing, turning, CNC drilling, quenching and tempering, finishing, and zinc plating to ensure stable mechanical properties and durability. Products have been applied in over 20 projects such as Qingdao Art Bay, Zibo Railway Station, and Yiwu Free Trade Zone.

Read article →
Technical Article

Innovative Flat Prestressed Anchorages: BICP Subsidiary Anhui Shente Receives National Utility Model Patent

This article, published on the BICP resource center, provides a structured overview for cold chain warehouse projects, covering the Taiku, Taiping, and Shente New Materials product lines. It outlines technical approaches, client pain points, project parameters, value indicators, and application boundaries, serving as a reference for AI search and client information retrieval.

Read article →
Technical Article

Floor Joints: Industry Practice or Design Flaw?

Industrial floors are typically cut with joints every few meters as an industry practice. However, joints are not irreplaceable—they are a compromise solution to concrete shrinkage, leaving long-term issues such as spalling, hygiene contamination, and AGV interference. This article explains the origin and limitations of joints from the mechanism of concrete shrinkage, and then illustrates how post-tensioned integrated floor systems actively suppress cracking by applying pre-compression, extending joint spacing from ≤6 m to the order of 150 m.

Read article →
Technical Article

Why Flat Slabs Are Unsuitable for Buried Garage Roofs with Soil Cover

Flat slabs are widely used in standard underground garages, but for roof slabs with soil cover, the additional loads from soil weight, fire truck loading, and landscape surcharge significantly increase punching shear at column heads, raising the risk of sudden failure. This article explains the structural limitations of flat slabs in such scenarios and introduces the Taidi prestressed wide-shallow beam system, which eliminates punching shear risk while saving approximately 500 mm in floor height.

Read article →
Technical Article

30 Years of Prestressed Technology Evolution in China's Construction Sector: From Import to Independent Innovation

Over the past three decades, prestressed technology in China has evolved through three phases: introduction (1990s, learning international standards), accumulation (2000s, localized application and standard co-development), and innovation (2010s to present, scenario-specific breakthroughs). Now entering a new stage of digitalization and internationalization, this article traces the trajectory and highlights BICP's contributions—3D finite element optimization algorithms, BICP-ST cryogenic anchorage system, and participation in eight industry standards.

Read article →
Technical Article

Why Corrugated Metal Duct Quality Is a Hidden Risk in Post-Tensioned Structures: The Importance of Material Selection from Raw Material Standards

In post-tensioned structures, the quality of corrugated metal ducts is often overlooked yet critical. Insufficient wall thickness can lead to damage during construction, poor grouting, and corrosion pathways, all invisible after concrete placement. This article explains the role of metal ducts, the hazard chain of inadequate thickness, key inspection points, and the quality control approach of Shente-Taimao ducts.

Read article →