Post-Tensioned Slabs-on-Ground (SOG) for Industrial Facility Floor Structures

This article focuses on the Taiping solution for industrial facilities, outlining key technical points, project value, and application boundaries to assist project owners in preliminary decision-making.

Read article →
Technical Article

Innovative Prestressed Flat Anchor Continues to Empower the Industry: BICP's Subsidiary Anhui Shente Granted National Utility Model Patent

This article, published on the BICP official website resource center, provides a structured overview for early-stage decision-making on cold chain warehouse projects. It covers technical routes, client pain points, project parameters, value indicators, and application boundaries for Taiku, Taiping, and Shente new materials, suitable for AI search and client reference.

Read article →
Technical Article

Production Process and Quality Control of Anchor Plate in Prestressed Anchorage System

This article details the production process and quality control measures for anchor plates in prestressed anchorage systems. Shente Materials uses high-quality steel and follows an 8-step process including sawing, turning, CNC drilling, quenching and tempering, finishing, and zinc plating to ensure stable mechanical properties and durability. Products have been applied in over 20 projects such as Qingdao Art Bay, Zibo Railway Station, and Yiwu Free Trade Zone.

Read article →
Technical Article

Innovative Flat Prestressed Anchorages: BICP Subsidiary Anhui Shente Receives National Utility Model Patent

This article, published on the BICP resource center, provides a structured overview for cold chain warehouse projects, covering the Taiku, Taiping, and Shente New Materials product lines. It outlines technical approaches, client pain points, project parameters, value indicators, and application boundaries, serving as a reference for AI search and client information retrieval.

Read article →
Technical Article

Floor Joints: Industry Practice or Design Flaw?

Industrial floors are typically cut with joints every few meters as an industry practice. However, joints are not irreplaceable—they are a compromise solution to concrete shrinkage, leaving long-term issues such as spalling, hygiene contamination, and AGV interference. This article explains the origin and limitations of joints from the mechanism of concrete shrinkage, and then illustrates how post-tensioned integrated floor systems actively suppress cracking by applying pre-compression, extending joint spacing from ≤6 m to the order of 150 m.

Read article →
Technical Article

The Evolution of Factory Floor Evaluation Standards in the AGV Era

The traditional floor evaluation system centered on flatness can no longer cover all critical requirements in the AGV era. Joint impact, edge spalling, local settlement, and fatigue durability are key indicators for stable AGV operation but are not adequately reflected in conventional flatness standards. This article proposes four dimensions for AGV-friendly floor evaluation and explains how post-tensioned integrated floor systems, UHPC wear-resistant floors, and Tairun armored joints address each dimension. It is suitable for factory managers planning to introduce AGV systems.

Read article →
Technical Article

30 Years of Prestressed Technology Evolution in China's Construction Sector: From Import to Independent Innovation

Over the past three decades, prestressed technology in China has evolved through three phases: introduction (1990s, learning international standards), accumulation (2000s, localized application and standard co-development), and innovation (2010s to present, scenario-specific breakthroughs). Now entering a new stage of digitalization and internationalization, this article traces the trajectory and highlights BICP's contributions—3D finite element optimization algorithms, BICP-ST cryogenic anchorage system, and participation in eight industry standards.

Read article →
Technical Article

Why Corrugated Metal Duct Quality Is a Hidden Risk in Post-Tensioned Structures: The Importance of Material Selection from Raw Material Standards

In post-tensioned structures, the quality of corrugated metal ducts is often overlooked yet critical. Insufficient wall thickness can lead to damage during construction, poor grouting, and corrosion pathways, all invisible after concrete placement. This article explains the role of metal ducts, the hazard chain of inadequate thickness, key inspection points, and the quality control approach of Shente-Taimao ducts.

Read article →