Industrial Facilities · Project Reference
Taiping System: 120m Ultra-Long Joint-Reduced Integrated Floor for Shifang Cigarette Factory Relocation Project
Project Overview
- Location
- Shifang, Sichuan, China
- Scenario
- Industrial Facilities
- Client
- China Tobacco Sichuan Industrial Co., Ltd.
- General Contractor
- Shanghai Baoye Group Co., Ltd.
- Designer
- China Light Industry Chengdu Design Engineering Co., Ltd.
- BICP Role
- Provided full-process Taiping integrated floor solution, including detailed design and post-tensioned specialty contracting.
- Key Conditions
- Ground floors of the joint production building, including primary processing, packaging and the finished-goods high-bay warehouse. Floor loads are 20 kN/m² in production areas and 100 kN/m² in the high-bay warehouse; the post-tensioned integrated floor covers about 40,000 m².
Project Challenges
Bays of about 6,300 m² had to be poured within one day, making crack and flatness control difficult; loads are heavy; 100 m production lines require high floor flatness.
Proposed Solution
Taiping post-tensioned integrated floor; slab thickness and tendon layout set by finite element analysis of a combined floor–subgrade model; full-process control of concrete mix, placement and curing; materials and methods optimised with the floor finishing contractor.
Project Overview
The Shifang Cigarette Factory Relocation Project of China Tobacco Sichuan Industrial Co., Ltd. is located in the Shifang Economic Development Zone (South), covering approximately 370 mu (24.7 hectares) with a total floor area of about 117,000 m². The project adopted the Taiping system—a low-carbon integrated floor solution—for the joint workshop's tobacco processing, temporary storage, blending, leaf storage, packaging, and high-bay warehouse areas. The system achieved a maximum single-pour bay length of 120 m, a maximum single-pour area of approximately 6,300 m², and a total post-tensioned integrated floor area of about 40,000 m².
Challenges and Solutions
Challenge 1: Large-volume concrete placement and crack control
With single bays up to 120 m long and 6,300 m² in area, all concrete had to be placed within one day, posing significant challenges for construction organization, concrete quality, crack control, and flatness. BICP advised on mix design, workability, placement and curing.
Challenge 2: Heavy loading requirements
Production floor live load: 20 kN/m²; high-bay warehouse live load: 100 kN/m². A coupled floor-soil finite element model was used to optimize slab thickness and tendon layout, ensuring structural adequacy.
Challenge 3: High flatness requirements
Tobacco processing lines up to 100 m long demand exceptional floor flatness. BICP worked with the finishing contractor on materials, methods and machinery; self-inspection confirmed the tolerances.
Advantages of the Taiping System
- Eliminates construction joints, retaining only minimal structural joints
- Reduces shrinkage and flexural cracking, enhancing durability
- Minimizes joint maintenance, lowering lifecycle costs
- Improves flatness by eliminating joint curling
- Allows reduced slab thickness while improving overload capacity and recovery
Selection Notes
- Post-tensioned integrated floors (Taiping) are suitable for industrial plants, underground garages and cold storage.
- Shente New Materials products (Taimao anchors, Tairen armored joints, and Taiqing anti-leak anchors) should be selected based on specific structural and floor system requirements.
Delivered Value
Joint-reduced integrated floor bays up to 120 m long and about 6,300 m² per single pour, with building joints eliminated and only a few structural joints left, lowering long-term maintenance costs.