Solution Guide · Industrial Facilities
BICP-SOG Crack-Reduced Integrated Floor System: Application Guide for Industrial Facilities and Underground Garages
This guide presents BICP's integrated floor solutions for industrial facilities, focusing on the Taiping and Taiku product lines. The content emphasizes reducing floor joints, improving flatness and durability, and includes three technical routes: post-tensioned integrated floor, UHPC integrated floor, and UHPC long-lasting repair. Additionally, it introduces the Taiku prestressed wide-beam solution for covered underground garage roofs.
Applicable Scenarios
Industrial Facilities
Key Engineering Questions
Traditional industrial floors often have numerous contraction and construction joints, leading to edge damage that affects forklifts, AGVs, and production continuity. Taiping offers three technical routes for integrated floor systems: post-tensioned integrated floor, UHPC integrated floor, and UHPC long-lasting repair. By reducing floor joints by up to 80%, it minimizes joint edge damage, dust, step offsets, and operational maintenance impacts on production. Taiku is a prestressed wide-beam solution for covered underground garage roofs, which can reduce floor height and excavation depth by approximately 500mm compared to traditional frame beam-slab systems.
Download or Inquiry
Request Full Resource
Online download is not available for this resource. Send an inquiry to discuss the material you need.
Request ResourceChecking download availability…
