BICP-SOG Crack-Reduced Integrated Floor System: Application Guide for Industrial Facilities and Underground Garages
This guide presents BICP's integrated floor solutions for industrial facilities, focusing on the Taiping and Taiku product lines. It covers technical approaches, and project value to assist project teams in early-stage decision-making. The content emphasizes reducing floor joints, improving flatness and durability, and includes three technical routes: post-tensioned integrated floor, UHPC integrated floor, and UHPC long-lasting repair. Additionally, it introduces the Taiku prestressed wide-beam solution for covered underground garage roofs.
Intended Readers
Owners, investors, operators, design teams and general contractors who need preliminary engineering assessment for the applicable scenario.
Applicable Scenarios
Industrial Facilities
Key Engineering Questions
It focuses on the Taiping, Taiku, and Shente New Materials product lines for industrial facility scenarios, detailing project pain points, solution paths, and value indicators. Traditional industrial floors often have numerous contraction and construction joints, leading to edge damage that affects forklifts, AGVs, and production continuity. Taiping offers three technical routes for integrated floor systems: post-tensioned integrated floor, UHPC integrated floor, and UHPC long-lasting repair. By reducing floor joints by up to 80%, it minimizes joint edge damage, dust, step offsets, and operational maintenance impacts on production. Taiku is a prestressed wide-beam solution for covered underground garage roofs, which can reduce floor height and excavation depth by approximately 500mm compared to traditional frame beam-slab systems.
Download or Inquiry
Full technical documents may require contact information for delivery and follow-up explanation. Submit a project inquiry if you need the complete resource or scenario-specific guidance.