Production Process and Quality Control of Anchor Plate in Prestressed Anchorage System

Back to Home

Direct answer

This article details the production process and quality control measures for anchor plates in prestressed anchorage systems. Shente Materials uses high-quality steel and follows an 8-step process including sawing, turning, CNC drilling, quenching and tempering, finishing, and zinc plating to ensure stable mechanical properties and durability. Products have been applied in over 20 projects such as Qingdao Art Bay, Zibo Railway Station, and Yiwu Free Trade Zone.

Author: BICPPublished: Updated:

Engineering explanation

The anchorage system is a permanent anchoring device used in post-tensioned concrete structures to maintain the tension of prestressing tendons and transfer it to the concrete. As a critical component, the anchor plate ensures the reliability and safety of the prestressed concrete structure. However, inferior anchor plates on the market often suffer from poor anchorage performance, uneven material, unstable mechanical properties, and insufficient strength, leading to tensioning failure and inadequate anchoring force, posing safety risks and unnecessary costs. To prevent these issues, Shente Materials adheres to a quality-first principle, strictly controlling every key production step. The processing flow is categorized into eight steps: sawing, turning outer diameter and end face, CNC drilling, CNC rough reaming, quenching and tempering, precision turning of outer diameter and end face, radial drilling machine precision reaming, and surface color zinc plating. Quenching and tempering adjust the steel's properties, enhancing strength, hardness, plasticity, and overall mechanical performance. After heat treatment, samples are inspected to ensure each batch has higher durability and stability, effectively avoiding safety hazards and cost overruns. Precision turning and reaming ensure geometric accuracy and surface smoothness. Finally, chemical color zinc plating isolates the steel from air corrosion, extending product life and saving costs. Shente Materials has supplied anchorage systems to over 20 projects, including Qingdao Art Bay, Zibo Railway Station, Yiwu Free Trade Zone, Shenzhen Yantian Port, Northeast Asia Aquatic Products Trading Center, and Zhanjiang Tianhe Cold Storage. Anhui Shente Prestressed Materials Co., Ltd., established in 2020, is the BICP group's materials company, responsible for R&D, production, and sales of anchorage system materials and equipment. It produces various specifications of prestressed anchors, bellows, and supporting tensioning, release, and grouting equipment, mainly used in cold chain warehouses, logistics storage, floors, stadiums, bridges, and railways. It has obtained multiple certifications and become an industrial enterprise providing full-process prestressed solutions from design and R&D to production, sales, and maintenance.

Next step

Submit your project for a preliminary review

Send the project type, location, floor area, loads and the issue you most want to resolve. The preliminary review is free; you will receive a written first assessment and the parameters needed for a detailed analysis.