Chengdu Yinli Cold Chain: Large-Span PT Solution Boosts Storage
BICP client interview: Chengdu Yinli Cold Chain Warehouse Taiku product case study.
The Chengdu Yinli Cold Chain Logistics Center is a cold chain logistics base in Southwest China, providing integrated warehousing, distribution, and cold chain logistics services for e-commerce enterprises. After Phase I (2014) and Phase II (2019) commenced operations, Phase III (B3, B6 cold storage and distribution center) is now under construction. BICP continues to deliver large-span post-tensioned cold storage solutions, post-tensioned design, and professional contracting services. Since 2016, BICP and Huashang International Engineering have jointly pioneered the first 'Taiku' large-span post-tensioned flat slab cold storage system in China (Phase II B4, B5), breaking traditional column grid constraints and increasing storage efficiency by approximately 40% in rack capacity compared to the small-column-grid scheme.