Video
Huangshanghuang Cold Chain Warehouse – BICP Case Study
BICP case study: Huangshanghuang cold chain warehouse using post-tensioned structures and AI-powered digital platform, reducing costs by 15% and increasing capacity by 20%.
BICP served as the contractor for the core cold storage project of Huangxing Cold Chain, a subsidiary of Huangshanghuang, in Nanchang Xiaolan Economic Development Zone. The project covers 280 mu with a planned investment of CNY 3 billion. BICP designed large-span column grids, a joint-free structure and flat slabs. Civil construction cost fell by 15% and effective storage capacity rose by 20%.
