BICPBuilding Intelligence Construction PlatformIndustrial Jointless Floor Engineering

Video

Qufu ETDZ Sci-Tech Innovation Park – Post-Tensioned Floor Case Study

BICP technical case study: Qufu Economic Development Zone Science and Technology Innovation Industrial Park post-tensioned floor project.

Back to Home

Traditional floors with numerous joints are prone to deformation and cracking, leading to high maintenance costs. The Qufu Economic Development Zone Science and Technology Innovation Industrial Park built the first heavy-duty workshop in China's automotive industry using post-tensioned floor technology. With a total construction area of 120,000 m² and an investment of 800 million RMB, the project was contracted by Shandong Shengqiang Construction Group and designed by Wuxi Industrial Architecture Design and Research Institute. BICP provided the "Taiping" ultra-long joint-free industrial floor solution through detailed design and construction delivery.