BICPBuilding Intelligence Construction PlatformIndustrial Jointless Floor Engineering

Video

Xianfeng Fruit East China Smart Cold Chain Project

BICP client case study: Xianfeng Fruit East China Smart Cold Chain Project.

Back to Home

The Xianfeng Fruit East China Smart Cold Chain Project, the world's largest single-building cold chain logistics park for fruit, invested CNY 250 million and covers 60,000 m². BICP and Huashang International Engineering applied the Taiku system. Compared to traditional design (approx. 1,800 pallet positions), the Taiku system achieves approx. 2,100 pallet positions, increasing storage capacity by 16.7%. Taiku has been applied in 300+ cold chain logistics centers.