Zhongtong Cold Chain Warehouse – BICP Taiku PT Flat Slab

Zhejiang Zhongtong cold chain warehouse uses BICP Taiku post-tensioned flat slab system. Column grid 11.2m×12.6m, slab thickness 600mm, story height 13.27m.

Back to Home

The Zhejiang Zhongtong cold chain warehouse project, with total investment of RMB 980 million and total floor area of 219,000 m², utilizes BICP Taiku post-tensioned flat slab system for cold storage workshops. The column grid is 11.2m×12.6m, slab thickness 600mm, and story height 13.27m. This system provides a smooth slab soffit, reducing insulation work and overall cost compared to conventional beam-slab structures. It improves airflow distribution, enhances refrigeration efficiency, and increases storage capacity by over 15%.