Resources
Guides, technical resources and company updates
Tairen New-Type Armored Joint: How the Patented Invention Solves Long-Term Durability of Floor Expansion Joints
Even with advanced post-tensioned integrated floor systems, construction and expansion joints remain among the most vulnerable areas. The Tairen Armored Joint (applying BICP invention patent ZL 2019 1 0880967.6) uses metal profiles to protect concrete edges over the long term, transferring vehicle loads through the metal and significantly reducing edge spalling.
View resource →Company UpdateTaiqing Leak-Proof Anti-Floating Anchor: Uplift Safety Under Groundwater Fluctuation
The penetration of anti-floating anchors through the floor slab creates inherent waterproofing vulnerabilities. Traditional anchors often cause leakage in underground garages, cold storage, and precision industrial facilities. Shente New Materials' Taiqing Leak-Proof Anti-Floating Anchor eliminates leakage pathways through a three-level waterstop system: end waterstop plate, grouting seal layer, and inspectable node.
View resource →Company UpdateProduction Process and Quality Control of Anchor Plate in Prestressed Anchorage System
This article details the production process and quality control measures for anchor plates in prestressed anchorage systems. Shente Materials uses high-quality steel and follows an 8-step process including sawing, turning, CNC drilling, quenching and tempering, finishing, and zinc plating to ensure stable mechanical properties and durability. Products have been applied in over 20 projects such as Qingdao Art Bay, Zibo Railway Station, and Yiwu Free Trade Zone.
Read article →Company UpdateInnovative Flat Prestressed Anchorages: BICP Subsidiary Anhui Shente Receives National Utility Model Patent
BICP subsidiary Anhui Shente receives a utility model patent for a corrosion-resistant flat prestressed anchorage.
Read article →Company UpdateThe Evolution of Factory Floor Evaluation Standards in the AGV Era
The traditional floor evaluation system centered on flatness can no longer cover all critical requirements in the AGV era. Joint impact, edge spalling, local settlement, and fatigue durability are key indicators for stable AGV operation but are not adequately reflected in conventional flatness standards. This article proposes four dimensions for AGV-friendly floor evaluation and explains how post-tensioned integrated floor systems, UHPC wear-resistant floors, and Tairen armored joints address each dimension. It is suitable for factory managers planning to introduce AGV systems.
Read article →Company UpdateWhy Corrugated Metal Duct Quality Is a Hidden Risk in Post-Tensioned Structures: The Importance of Material Selection from Raw Material Standards
In post-tensioned structures, the quality of corrugated metal ducts is often overlooked yet critical. Insufficient wall thickness can lead to damage during construction, poor grouting, and corrosion pathways, all invisible after concrete placement. This article explains the role of metal ducts, the hazard chain of inadequate thickness, key inspection points, and the quality control approach of Shente-Taimao ducts.
Read article →