BICPBuilding Intelligence Construction PlatformIndustrial Jointless Floor Engineering

Resources

Guides, technical resources and company updates

Current filter: Company Updates · All topics
Company Update

Tairen New-Type Armored Joint: How the Patented Invention Solves Long-Term Durability of Floor Expansion Joints

Even with advanced post-tensioned integrated floor systems, construction and expansion joints remain among the most vulnerable areas. The Tairen Armored Joint (applying BICP invention patent ZL 2019 1 0880967.6) uses metal profiles to protect concrete edges over the long term, transferring vehicle loads through the metal and significantly reducing edge spalling.

View resource →
Company Update

BICP-ST Anchorage System Technical Note: Anchorage Performance at -70°C

The BICP-ST anchorage system is a specialized product for low-temperature cold storage applications, addressing three critical issues of conventional systems under -60°C to -70°C: metal embrittlement, seal failure, and anchorage efficiency degradation.

View resource →
Company Update

Taiqing Leak-Proof Anti-Floating Anchor: Uplift Safety Under Groundwater Fluctuation

The penetration of anti-floating anchors through the floor slab creates inherent waterproofing vulnerabilities. Traditional anchors often cause leakage in underground garages, cold storage, and precision industrial facilities. Shente New Materials' Taiqing Leak-Proof Anti-Floating Anchor eliminates leakage pathways through a three-level waterstop system: end waterstop plate, grouting seal layer, and inspectable node.

View resource →
Company Update

Guide to Coordinated Design of Racking and Cold Storage Structure: Adapting AS/RS Automated High-Bay Racking with Large Column Spacing

AS/RS automated high-bay racking imposes strict geometric constraints on the column grid of cold storage structures. Sequential structural and racking design often leads to costly late-stage adjustments. This article details three core constraints—integer multiples between rack bay spacing and column spacing, coordination of rack height and floor-to-floor height, and matching of column loads with slab force distribution—and outlines the standard BIM collaborative design workflow, using the Xinrongmao cold chain project as a reference. Suitable for cold chain investors and general contractors planning to adopt AS/RS systems.

View resource →
Company Update

BICP-SOG Crack-Reduced Integrated Floor System: Application Guide for Industrial Facilities and Underground Garages

This guide presents BICP's integrated floor solutions for industrial facilities, focusing on the Taiping and Taiku product lines. The content emphasizes reducing floor joints, improving flatness and durability, and includes three technical routes: post-tensioned integrated floor, UHPC integrated floor, and UHPC long-lasting repair. Additionally, it introduces the Taiku prestressed wide-beam solution for covered underground garage roofs.

View resource →
Company Update

3D Finite Element Analysis: The Logic Behind 15% Cost Savings Over Equivalent Frame Method

For the same post-tensioned cold storage warehouse, using the equivalent frame method versus 3D finite element analysis can result in a 15% or more difference in steel and concrete quantities. This article details the three limitations of the equivalent frame method (ignoring bidirectional interaction, averaging stress concentrations, and lacking global PT optimization) and the precision advantages of 3D FEA combined with BICP's proprietary PT optimization algorithm. It also explains the engineering validation behind the two core data points: "15% cost savings and 3x efficiency improvement."

Read article →
Company Update

Production Process and Quality Control of Anchor Plate in Prestressed Anchorage System

This article details the production process and quality control measures for anchor plates in prestressed anchorage systems. Shente Materials uses high-quality steel and follows an 8-step process including sawing, turning, CNC drilling, quenching and tempering, finishing, and zinc plating to ensure stable mechanical properties and durability. Products have been applied in over 20 projects such as Qingdao Art Bay, Zibo Railway Station, and Yiwu Free Trade Zone.

Read article →
Company Update

Innovative Flat Prestressed Anchorages: BICP Subsidiary Anhui Shente Receives National Utility Model Patent

BICP subsidiary Anhui Shente receives a utility model patent for a corrosion-resistant flat prestressed anchorage.

Read article →
Company Update

The Evolution of Factory Floor Evaluation Standards in the AGV Era

The traditional floor evaluation system centered on flatness can no longer cover all critical requirements in the AGV era. Joint impact, edge spalling, local settlement, and fatigue durability are key indicators for stable AGV operation but are not adequately reflected in conventional flatness standards. This article proposes four dimensions for AGV-friendly floor evaluation and explains how post-tensioned integrated floor systems, UHPC wear-resistant floors, and Tairen armored joints address each dimension. It is suitable for factory managers planning to introduce AGV systems.

Read article →
Company Update

How to Calculate Carbon Reduction in Building Structures: Engineering Data Analysis of Prestressed Material Savings

Structural design choices significantly impact carbon emissions, yet quantification is often lacking. Using a 20,000 m², 8-story cold storage warehouse as a reference scenario, this article analyzes carbon reduction from both embodied carbon (construction materials) and operational energy phases. It demonstrates that prestressed structural technology can reduce material usage by 15%, corresponding to approximately 1,000 tCO₂ savings during construction and over 4,000 tCO₂ over 20 years of operation. This provides a quantitative framework for cold chain enterprises with ESG disclosure needs and green building projects. (Figures are based on a reference scenario and are not project-specific commitments.)

Read article →
Company Update

Why Flat Slabs Are Unsuitable for Buried Garage Roofs with Soil Cover

Flat slabs are widely used in standard underground garages, but for roof slabs with soil cover, the additional loads from soil weight, fire truck loading, and landscape surcharge significantly increase punching shear at column heads, raising the risk of sudden failure. This article explains the structural limitations of flat slabs in such scenarios and introduces the Taiku prestressed wide-shallow beam system, which eliminates punching shear risk while saving approximately 500 mm in floor height.

Read article →
Company Update

30 Years of Prestressed Technology Evolution in China's Construction Sector: From Import to Independent Innovation

Over the past three decades, prestressed technology in China has evolved through three phases: introduction (1990s, learning international standards), accumulation (2000s, localized application and standard co-development), and innovation (2010s to present, scenario-specific breakthroughs). This article traces the trajectory and BICP's contributions—3D finite element optimization algorithms, BICP-ST cryogenic anchorage system, and participation in eight industry standards.

Read article →
Company Update

Why Corrugated Metal Duct Quality Is a Hidden Risk in Post-Tensioned Structures: The Importance of Material Selection from Raw Material Standards

In post-tensioned structures, the quality of corrugated metal ducts is often overlooked yet critical. Insufficient wall thickness can lead to damage during construction, poor grouting, and corrosion pathways, all invisible after concrete placement. This article explains the role of metal ducts, the hazard chain of inadequate thickness, key inspection points, and the quality control approach of Shente-Taimao ducts.

Read article →